Mohammad Zhalehpour

Note

Project work and product work

The subject of those years was direction of a software company in Dubai. The current post is engineering lead of a travel system. A project ends at handover to the client. On a product, maintenance after release remains.

A project ends. A product does not.

In a studio, the work is a scope and an acceptance criterion. The team forms around that contract and disperses after delivery. Success is closing that scope at the quality the client agreed to.

On a product, release is the beginning of maintenance. Tomorrow’s booking remains, tomorrow’s data remains, and the person who must determine at night that payment is final and issuance is not belongs to the team, not to the purchaser of a project. If “a demonstration was given” is still the definition of completion, the role is not that of a chief technology officer. It is that of a delivery manager under a different title.

Cover distance with a document

When people are not in the same room, a spoken decision lasts about as long as the meeting. A decision that changes a service boundary, the meaning of a state, or the owner of a piece of data has to be written down: what was chosen, what was rejected, and which cost was accepted.

It does not need a heavy template. One page that is still readable next month is enough. A team without that page implements a private architecture in code and calls it alignment.

Hire for the boundary

A travel product today has more than one language and more than one store. Backend services, .NET, database administration, and the tools beside them. The right expectation is not that one person is the deepest in all of them. The right expectation is that they know the edge of their responsibility and, when they talk about an index, a cache, or an event, they can also name the cost.

I do not need to be the fastest author in every language on the team. I do need to know which decisions are expensive to reverse a month later: the booking state model, the boundary between money and issuance, and the shape of the data that finance reports read. Those are opened up in the booking-path note.

Someone who can explain the tradeoff has understood the system

A large part of my work has been teaching, from vocational courses to database administration for the Civil Aviation Organization. That history leaves a plain test for hiring: an engineer who cannot explain the tradeoff to the person who will operate the system has not finished thinking it through.

An explanation is not the same as a comforting simplification. “This query is slow because a function sits on the column” is useful. “The database is slow” hides the problem.

The details I still do not hand off

I do not read the team’s everyday code line by line. I do read the execution plan of a hot query, the indexes on a write-heavy table, and the state names that flow into a finance report. That is where a small decision creates weeks of support. Everything else should not wait on one person’s taste.

Engineering leadership is not seeing less code. It is seeing the code at the point where walking it back is expensive.

Was this note useful?